Pink Pages     MyLocalHero 2019     Advertise with us     

BreakingYourLocalNews

HELPING HISTORY: Listed building undergoing major refurbishment

 Published on: 15th February 2020   |   By: News Bulletin   |   Category: Uncategorized

The 300-year-old Frogmore House and garden is undergoing major renovation and repair, thanks to plans passed by Watford Borough Council.

The Grade II* listed building (one of only four in Watford), located on Lower High Street, is undergoing a full refurbishment and restoration at a cost of £2million to bring it back into active use as an office space.

A requirement of the planning permission granted for supermarket Lidl and the adjacent residential development, meant that the developer had to restore the listed building.

The council worked with The National Grid (the former owners of the site) for a number of years to secure a viable scheme that allowed Frogmore House to be restored.

The whole of Frogmore House, except the single-storey rear extension added at a later date, is being retained and the historical and architectural value of the building is being preserved.

The building, owned by St William Homes LLP, (a joint venture between The Berkeley Group and National Grid Property), is listed on the national Historic England’s ‘Heritage at Risk’ register and needs urgent renovation and repair to bring it back to its former glory.

The property, built in 1716, has been used as residential accommodation throughout the years but fell into disrepair during the 1970s and by the 1990s was suffering from a variety of issues and was identified as a Building at Risk.

Elected Mayor of Watford Peter Taylor said: “Frogmore House is a really important part of our town’s history. Having fallen into disrepair many years ago it is great that the building is being restored and brought back into use. We are committed to preserving and enhancing Watford’s heritage and I’m glad that Watford Council has worked with others on this restoration project.”

Frogmore also sits on the banks of the River Colne As part of the plan, the current concrete embankment is undergoing a huge re-profiling and will be replaced with a landscaped sloped embankment to not only improve the look of the area, but will increase the capacity of the river to reduce the flood risk.

Sign up to get weekly local news updates & offers:

  • This field is for validation purposes and should be left unchanged.

0 Comments

Leave a comment

*

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Advertise with our magazine
Top